Iecava bridge in Ozolnieki
The 64 meter long bridge over Iecava was built in 1958. In August 2008, a bridge reconstruction was started, which lasted until early July 2009. During bridge reconstruction the Ozolnieku-Dalbe road could not be used for 345 days.
Continue reading